Rack server finished, with storage and security setup next

The first build is complete, with custom SATA power cable used to organize internal power wiring. was harder than expected. The stiff SAS/SATA cables made neat routing difficult.

The next step is finding more storage drives that are not too expensive. The first planned project is connecting a hard-wired system through an AJAX hub.

Key points

  • The build is finished with custom SATA power cable .
  • was difficult because SAS/SATA cables were stiff.
  • More storage drives are needed, but price is a concern.
  • The first planned use is integrating a hard-wired system through an AJAX hub.
Read original