Rack server finished, with storage and security setup next
r/homelabJun 30, 2026 · 13d ago
The first build is complete, with custom SATA power cable used to organize internal power wiring. was harder than expected. The stiff SAS/SATA cables made neat routing difficult.
The next step is finding more storage drives that are not too expensive. The first planned project is connecting a hard-wired system through an AJAX hub.
Key points
The build is finished with custom SATA power cable .
was difficult because SAS/SATA cables were stiff.
More storage drives are needed, but price is a concern.
The first planned use is integrating a hard-wired system through an AJAX hub.